Thornhill Primary School, Houghton Regis

Project Value – £1.5m

Project Duration – 52 Weeks

Project Description;

New build passivhaus primary school in the heart of a new local residential development.

Scope of Works;

  • Full cut/fill inclusive of extensive stone filling to bring levels upto plateau
  • Storm and foul drainage install including attenuation tanks
  • Staged mass pour trench foundations
  • Reinforced concrete upstands for CLT frame install
  • Greenguard insulation to slab with a +/- 5mm tolerance
  • Large power floated concrete slab
  • RIW waterproofing detail to slab edges and concrete upstands
  • Full externals package including multiple external concrete slabs (Bin store/cycle stores etc)