Thornhill Primary School, Houghton Regis
Project Value – £1.5m
Project Duration – 52 Weeks
Project Description;
New build passivhaus primary school in the heart of a new local residential development.
Scope of Works;
- Full cut/fill inclusive of extensive stone filling to bring levels upto plateau
- Storm and foul drainage install including attenuation tanks
- Staged mass pour trench foundations
- Reinforced concrete upstands for CLT frame install
- Greenguard insulation to slab with a +/- 5mm tolerance
- Large power floated concrete slab
- RIW waterproofing detail to slab edges and concrete upstands
- Full externals package including multiple external concrete slabs (Bin store/cycle stores etc)