Little Martins, Brightwell-Cum-Sotwell

Project Value – £2.3m

Project Duration – 60 Weeks

Project Description;

31 plot residential development with mix of large detached family homes

Scope of Works;

  • Full earthworks package cut/fill including reinstatement of archeological digs
  • Mixture of piled foundations and mass pour strip foundations with heave protection
  • All infrastructure works including adoptable roads, S50 drainage works and S278 works
  • Full storm and foul drainage install  including large attenuation tanks in common areas and small private soakaways
  • Full externals package including permeable block paved private and shared driveways, patios, retaining walls and soft landscaping